New Septic System Installation Process
Installing a new septic system requires careful planning, engineering, and county approval to protect public health and groundwater.
1. Site Evaluation & Soil Testing
Soil testing determines whether the property can support a septic system and what type is allowed.
2. Engineered System Design
A licensed engineer designs the septic system based on soil conditions and property layout.
3. County Permit Approval
Permit applications are submitted with engineered plans, soil reports, and required fees.
4. Septic System Installation
A licensed contractor installs the system according to approved plans.
5. Final Inspection & Approval
The county inspects the system and issues final authorization for use.